尼亚加拉大瀑布地区中文门户网|圣凯瑟琳|布鲁克大学|尼亚加拉学院|房地产投资-NiagaraDIY.com

 找回密码
 立即注册
打印 上一主题 下一主题

尼亚加拉大瀑布在夜间是否人工控制水量?

[复制链接]
跳转到指定楼层
楼主
     查看: 2334   |   回复: 0
Niagara Power Generating Quick Facts: Do they shut off Niagara Falls at night?
During the tourist season (April 1st to Oct 31st) by agreement of the Canadian/American Governments, the water flowing over the Falls is maintained at 100,000 cubic feet per second. This level of water flow is what 12 million visitors come to see each year. In order to provide this level of water flow over the Falls, Ontario Hydro and the New York Power Authority can only draw a reduced amount of water so as not to interfere with the amount of water going over the Falls.

After dusk each night during the tourist season, the water flow rate going over the Falls is reduced to only 50,000 cubic feet per second. This allows the Hydro Authorities to draw more water for hydro generation.
During the night time, both Ontario Hydro and the New York State Power Authorities pump massive amounts of water into their gigantic water reservoirs in order to top them up. Ontario Hydro’s reservoir is 212 acres and is smaller than the American Robert Moses Hydro reservoir. During the daytime when the water flow is increased over the Falls for the tourists, the hydro companies draw the water from their reservoirs for hydro generation to make up for any water deficit.
This is a cycle which occurs every day.
The only difference occurs between November 1st and April 1st of each year (non tourist season). During this period, the water rate of flow is reduced to 50,000 cubic feet per second on a 24 hour basis. Hydro draws the rest of the water for hydro generation. The reduced water flow and the lowering of the water level is the reason the Maid of the Mist boat has to be out of the water by October 31st each year.
The hydro control dam is jointly owned by Canada/USA. It is operated by Ontario Hydro by agreement. The reason its on Canadian side is that the water flows towards the Canadian side (the river bed slants). The water being drawn for hydro is strictly regulated. Ontario Hydro and New York State Power Authority have scheduled water drawing times. When the Americans are drawing water, the gates on the dam are closed. This causes the water to be forced to flow towards the water intakes on the American side. At times when Ontario Hydro is diverting water, the dam assists in directing water to their intakes as well.
The normal long term average rate of water flow in the Niagara River is 212,000 cubic feet per second so even on a summer day, approximately 100,000 cubic feet of water per second are being drawn for hydro generation.
Niagara Power Generating Quick Facts
The Niagara generating stations supply one quarter of all power used in New York State and Ontario.
Ontario Hydro operates 2 Hydro Generating Stations in Niagara Falls, they are Sir Adam Beck Plant #1 & Plant #2 located along the Niagara Parkway.
The Robert Moses Hydro Electric Plant is located in Niagara County of Western New York State between Niagara Falls, New York and Lewiston, New York.
The Sir Adam Beck Generating Stations and the Robert Moses Generating Station are built directly opposite each other. Both Generating Stations are joined to each others electrical grid system by high voltage transmission lines.
The Sir Adam Beck Generating Station Plant #2 and the Robert Moses Generating Station have a small tramway that they can use to traverse from one plant to the other by crossing the Niagara River Gorge.
Between the base of the Horseshoe Falls and the Whirlpool the water elevation drops approximately 22 metres.
From November to April, the water in the river below the Falls does not fluctuate substantially and during this period water diversion for hydro electric generation is at its maximum.
At night, when Hydro Control Dam gates are lifted for diversion of Niagara River water into the hydro tunnels, the flow over the Horseshoe Falls drops to a minimum 15,240 cubic metres of water per second.
By the International Agreement, the Canadian power stations draw 56,500 cubic feet of water per second and the American power stations draw 32,500 cubic feet of water per second.
The Sir Adam Beck Generating Stations and the Robert Moses Generating Station together form the largest generators of hydro electric power in North America.
Flow rates of water are monitored by Ontario Hydro through sensing devices on both the Rainbow International Bridge and the Whirlpool International Bridge.
The Ontario Hydro water intake gates for water diversion are located 2.6 km upstream from the Horseshoe Falls.
The International Control Dam operated by Ontario Hydro and the New York State Power Authority is located 2.6 km upstream from the Falls.
Approximately 18 gates are raised or lowered in order control the water flow over the Falls for diversion into the Hydro Tunnels of Ontario Hydro and the New York State Power Authority. The dam extends 670m to the International boundary.
Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls.
Ontario Hydro has a 750 acre water reservoir above the Sir Adam Beck plants. At night, water is pumped into this reservoir which acts as a backup system. During the day, Ontario Hydro draws water from the reservoir to fill the water gap in order that the generators run at optimum capacity.
The Robert Moses Hydro Electric Generating Plant has two buried water intakes, which are located upstream of the Falls. Both conduits are parallel to each other and are 30 m deep and 121 m wide.
The now retired Ontario Power Company was located at the base of the Horseshoe Falls. It consisted of 10 generators and had a total power output capacity of 100,000 horsepower.
In 1999, Ontario Hydro underwent a major restructuring. The company was divided into two sections: The Ontario Power Generation Company and the Ontario Power Distribution Company.
At the current time, both New York State Power Authority – Niagara Project and Sir Adam Beck Power Group continue to refit generators with plans to increase efficiency and power generation capacity. Ontario Power Generation has reached its maximum diversion capacity.
联系时请说是在NiagaraDIY.com看到的,谢谢!
回复 论坛版权

使用道具 举报

广告位C4招商中
(点 击 查 看 详 情)
尼亚加拉大瀑布地区中文门户网NiagaraDIY.com是一个集新闻、房地产、娱乐、旅游、生活为一体的综合性网站。本网站不仅致力于为Niagara Falls, St. Catharines, Niagara-On-The-Lake, Fort Erie, Welland, Grimsby, Lincoln, West Lincoln, Port Colborne, Wainfleet, Thorold, Pelham等整个尼亚加拉地区的华人朋友提供完善的社区服务,为中国投资者及海外华人提供最新最全的尼亚加拉大瀑布地区房地产投资,房源信息和房价走势,还为众多前往大瀑布的中国旅游者提供全面的景点和住宿资讯。同时,我们特别为布鲁克大学(Brock University)和尼亚加拉学院(Niagara College)的中国留学生朋友们开设了租房版块、美食版块、顺风搭车和二手交易版块,让同学们的海外留学生活(吃/住/行)更加方便!舒适!多彩!
投资型房源推荐,房产经纪人推荐,装修公司推荐,房屋贷款经纪人推荐,中国人创业投资

切换至手机版|尼亚加拉大瀑布地区中文门户网 NiagaraDIY.com

GMT+8, 2024-11-24 18:03 , Processed in 0.062239 second(s), 29 queries .

Advertise with us

© www.niagaradiy.com






快速回复 返回顶部 返回列表